Park and Recreation Mowing Completed August 25th
September 10, 2019

| Hand Ditch Location/Address | Date |
| Hwy. 20 around Ingalls Harbor | 8/23/19 |
| R/R Walking Bridge next to Gobble Fite Lumber | 8/23/19 |
| R/R Bridge on Hwy. 20 NW | 8/23/19 |
| R/R Walking Bridge next to Old Depot | 8/23/19 |
| 310 Church St. NW | 8/23/19 |
| Church St NW & McCartney St. NW | 8/23/19 |
| 309 Monroe St. NW | 8/22/19 |
| 405 Monroe St. NW | 8/22/19 |
| 201 11th Ave. NW to 12th Ave. NW | 8/23/19 |
| 202 10th Ave. NW to 11th Ave. NW | 8/23/19 |
| 118 4th Ave. NW | 8/22/19 |
| Decatur Shopping Center on Moulton St. NW-Dollar General | 8/19/19 |
| West Moulton St. from Dollar General out to Beltline NW | 8/19/19 |
| Cut V Shaped area at intersection of West Moulton & Old Moulton Rd. | 8/19/19 |
| Old Moulton Rd. behind Nafco both sides of Road. | 8/19/19 |
| 2301-2319 Cumberland Ave. SW | 8/19/19 |
| 2302-2310 Cumberland Ave. SW | 8/19/19 |
| 2310-2319 Cumberland Ct. SW | 8/19/19 |
| Guardrail at Danville Rd. Holding Pond SW | 8/19/19 |
| 8th St. SW behind Crossroads Grocery both sided of Street. | 8/19/19 |
| Central Parkway from 8th St. SW to 1st St. SW | 8/19/19 |
| Central Parkway next to Turner Pest Control SW | 8/19/19 |
| Hwy. 67 from Lynn Layton out to Deere Rd. SE (Sunday 25th) | 8/25/19 |
| Hwy. 20 from Beltline Rd. to Hwy. 31 (Sunday 25th) | 8/25/19 |
| Additional Areas Completed | |
| Hwy 31 South from Lynn Layton to Flint Big A | 8/22/19 |
| Right of Way Location/Address | Date |
| Hwy. 67 from Lynn Layton to Deere Rd. (Sunday 25th) | 8/25/19 |
| Hwy. 20 from Beltline Rd. to Hwy. (Sunday 25th) | 8/25/19 |
| Backwater Canal off 2nd St. NW | 8/19/19 |
| Finley Dr. NW | 8/19/19 |
| Railroad St. NW next to Depot | 8/19/19 |
| Church St. NW | 8/19/19 |
| Davis St. NW | 8/19/19 |
| Washington St. NW along R/R Tracks | 8/19/19 |
| Memorial Dr. NW next to Carrie Matthews St. | 8/19/19 |
| Carrie Matthews Ditches NW | 8/19/19 |
| Ditch between 11th Ave. & 12th Ave. NW | 8/20/19 |
| Ditch Between 12th Ave. & 13th Ave. NW | 8/20/19 |
| Ditch behind Monroe St. NW up to small bridge | 8/20/19 |
| 16th Ave. NW Ditch | 8/20/19 |
| West Moulton St. NW out past Sale Barn | 8/20/19 |
| Old Moulton Rd. NW | 8/20/19 |
| Canterbury Ditch NW | To Wet |
| 2nd St. SW by Cemetery | 8/20/19 |
| Old Moulton Rd. from Brookline Ave. SW to Woodall Rd. SW | 8/23/19 |
| Sherwood Oaks SW | 8/23/19 |
| Red Sunset SW | 8/23/19 |
| Woodall Rd. SW | 8/23/19 |
| Shady Grove Ln. SW | 8/23/19 |
| Bunny Ln. SW | 8/23/19 |
| Modus Rd. SW | 8/23/19 |
| Additional Areas Completed | |
| Hwy. 31 South from Lynn Layton to Flint Big A | 8/22/19 |
Paul B. Floyd, CPRP
Facilities & Operations Manager